mdot hma selection guidelines


All personnel involved in the project must be required to comply with all safety standards applicable to the type of construction and asphalt paving work to be carried out. The Local Agency Programs (LAP) Unit administers the local allocation of federal and state aid programs (Urban, Rural, Bridge, Enhancement, Economic Development, and Special Appropriations). The rolling zone is the distance behind the paver where the breakdown roller operates. These defects can be divided into two primary categories: equipment related and mixture related. This check is done by roughly measuring the area covered by one truckload; the tonnage placed is known from the load ticket. FHWA Emergency Relief Flow Chart The faster a roller passes over a point on the asphalt surface, the less time the weight of the roller has to work on that point; this means that less compactive effort is applied to the mixture. If required, the truck bed should be insulated. Hand raking and shaping around the cover must be completed before the material cools. This document replaces the previous edition of the guidance, published in 2009. Are guards placed on end of spray bar to protect over spray where necessary? The augers must be extended if the screed is extended. This will happen on windy days and when the mat thickness is thin, normally the wearing course. 81R ?+iKEsNAn#w In the longitudinal direction, the rollers should not stop at the same transverse end point with each pass of the roller; the reversal points should be staggered to prevent shoving of the mix. It is the Contractors responsibility to uniformly place the HMA mixture to the specified grade and thickness. Ensure the bond coat has been applied uniformly at the proper yield. Flexible Pavement: Pavement ride quality is affected by all phases of the construction process; to ensure a smooth finished product, good construction practices must be followed throughout the entire paving process. The auger on each side of the paver is operated independently of the other. No paving shall occur using RAP from the project until a mix design is approved. Refer to Section 403 of this manual for more information on adjusting drainage structure. ATSSA/NACE Low Cost Local Road Safety Solutions Distributor Checklist - Manufacturer and Distributor Number -______________________________. Certifications are good for one construction season only. Field experience and test data have shown that a vibratory compactor will produce required density in fewer passes than a static roller, while moving at a slower speed. It is MDOTs responsibility to conduct quality assurance and verification sampling and testing to ensure conformity of the mix to 20SP501(R) Superpave Hot Mix Asphalt Percent Within Limits (PWL) or 20SP501(S) Superpave Hot Mix Asphalt Percent Within Limits (PWL) For Capital Preventive Maintenance (CPM) Mill & Resurface Projects and CPM One Course Overlay Projects.This testing is done at the field laboratory provided by the Contractor located at the asphalt plant or at an MDOT Region Lab. Local Bridge Advisory Board Contact Information, Local Bridge Program Public Meeting Announcements, Public Notice of Local Bridge Advisory Board Meeting October27, 2022- Location Change The HMA Selection Guidelines for design with the 2012 MDOT Standard Both versions will remain available on the website until the 2012 MDOT Standard Specifications for Construction is phased out. Raveled, dried-out surfaces must be re-compacted and restored to the proper cross section. A release agent may be applied to the surfaces of the truck or trailer bed. NEPA Guidance For asphalt mixes, it can be expected that about 70 percent to 80 percent of the theoretical maximum density may be obtained as the mixture passes under the screed. HMA types will be as specified on the plans or in the proposal. When specified, special additives may be required. The subject of joints includes longitudinal joints and transverse joints, as well as the matched joint between an asphalt surface and a concrete pavement, or gutter pan. This equipment should be thoroughly checked before using it on the project. {7:r!> -)t=:NuL5oqba5q]oe`0jC The truck push rollers, located on the front of the paver hopper, are used to maintain contact with the tires of the truck and to push the truck ahead of the paver. Transportation Reality Check takes on some of these myths, and explains why MDOT does things the way they do. The names and titles of any people involved in the discussion should be written down, as well as the topics discussed. The top course mixture can be used for wedging when the thickness is less than 2 inches. It is also used in Mexico. Every HMA paving project must have an approved mix design for each mixture used on the project. Did you know that millions of people visit the Great Lakes State every year? Each pressure distributor shall be capable of maintaining the specified application rate within +/- 0.015 gallons/square yard for each load. When such changes do occur, it is important that they be communicated between the Contractor and MDOT and between MDOT and the Contractor. The taper shall be constructed by the use of an approved strike off device attached to the screed that will provide a uniform slope and will not restrict the main screed. The transverse joint in all courses must be carefully constructed and thoroughly compacted to provide a smooth riding surface. It shall be capable of maintaining the asphalt emulsion at the specified temperature. 4642 0 obj <>/Metadata 255 0 R/PageMode/UseNone/PageLayout/OneColumn/OpenAction 4666 0 R/ViewerPreferences<< >>>> endobj 4644 0 obj <>/ExtGState<>/XObject<>/ProcSet[/PDF/Text/ImageB/ImageC/ImageI]>>/MediaBox[0 0 612 792]/Contents 4645 0 R/Group<>/Tabs/S/StructParents 0/CropBox[ 0 0 612 792]/Rotate 0>> endobj 4645 0 obj <>stream Included are examples of calculations, documentation requirements, and . Some pavements may be disintegrated so badly that the fragments may have to be removed. The temperature of the mix must be kept uniform so that the viscosity of the mix does not change and influence the balance of forces acting on the screed. The Michigan Department of Transportation (MDOT) is responsible for Michigans nearly 10,000-mile state highway system, comprised of all M, I, and US-routes. This special provision applies to all Hot Mix Asphalt (HMA) acceptance testing for all Road Commission for Oakland County (RCOC) roads. The TSCs are designed to respond to the transportation needs of local communities for the highest level customer service. After coring is completed, the inspector should check the layer thickness for conformance to the standard specifications. This requires the level of mix in the hopper to be kept at least even with the bottom of the flow gates. When using drum mix plants, the aggregate moisture content of each stockpile should be taken at least once a day and the number entered into the plant control system. For vibratory rollers, the following can be controlled by the operator: vibration frequency, vibration amplitude and direction of travel, when frequency and amplitude are engaged according to the manufacturers recommendations. Can VPM be locked in on vibratory rollers? endstream endobj On structures in the curb line out of the traveled roadway, the top of the cover should be 3/8 inch (8 mm) below the wearing surface after final compaction is completed. A rule of thumb is that the proper level of air voids should be obtained before the mixture cools to a temperature of 176F. If the random core location falls over a tapered joint, it should be moved to the first point that the mat is full depth. If it is below the specification limit, 250F, it should be discarded. It responds to and averages changes in mat elevation in the same manner as the floating beam. Transportation Systems Management & Operations, Transportation and Civil Engineering Program, Transportation and Civil Engineering Internship, Transportation Diversity Recruitment Program, https://dev.michigan.local/som/json?sc_device=json, 2nd Street Bridge over Kalamazoo River in Allegan County, Maritime and Port Facility Assistance Office, National Summer Transportation Institute Program, Go to Transportation Systems Management & Operations, Go to Transportation and Civil Engineering Program, Go to Transportation and Civil Engineering Internship, Go to Youth Development & Mentoring Program, Go to Transportation Diversity Recruitment Program, Mackinac Straits Corridor Authority (MSCA), Transportation Asset Management Council (TAMC), Logistics & Supply Chain Collaboration (LSC), Instructions for Preparing to Bid Federal Aid Projects Through MDOT, Instructions for Construction of Federally Funded Local Agency projects by Non-Competitive Bid Contract (Force Account), Bridge Area Staff Engineer Contact Information, Regional Bridge Councils Contact Information, Local Bridge Advisory Board Contact Information, Public Notice of Local Bridge Advisory Board Meeting October27, 2022- Location Change, Public Notice of Bay Region Bridge Council Meeting for October 3, 2022, Public Notice of Grand Region Bridge Council Meeting for October 10, 2022, Public Notice of Metro Region Bridge Council Meeting for September 28, 2022, Public Notice of North Region Bridge Council Meeting for September 22, 2022, Public Notice of Southwest Region Bridge Council Meeting for October 5, 2022, Public Notice of Superior Region Bridge Council Meeting for September 23, 2022, Public Notice of University Region Bridge Council Meeting for October 12, 2022, FY 2025 Local Bridge Applications Received, FY 2022 LAP Bridge Scoping Cost Estimate Worksheet, FY 2025 Local Bridge Program Call For Applications - Due April 2022, FY 2026 Local Bridge Program - Call for Applications Submission Sheet, Asset Management Guide for Local Agency Bridges in Michigan, Asset Management Bridge Inventory Data and Maintenance Plan Spreadsheet, TE Grant Applicant Roles/Responsibilities, FY 2024 Local Safety Program Applications Received, FY 2024 Safety (HSIP and HRRR) Call Letter, FY 2024 Electronic Application Submittal Form, FY 2024 HSIP Streamlined Systemic Application, Highway Safety Manual (HSM) Analysis Spreadsheet, 2024 Streamlined Systemic HSIP Selection List, 2023 Streamlined Systemic HSIP Selection List, ATSSA/NACE Low Cost Local Road Safety Solutions, Incorporating Safety into Resurfacing and Restoration Projects, Common Safety Countermeasures for Local Agencies for Segments and Intersections, Common Safety Countermeasures for Local Agencies for Peds and Bikes. All mixtures specified for a project must have an approved mixture design before mix production can proceed. b. **If in line crushing and/or screening is being used to ensure that the RAP being introduced into the HMA mixture contains no aggregate larger than the top size aggregate allowed in the mix design a RAP scalper screen may not be required. The proposal and plans should be reviewed to see if the cold-milling will be for profiling, or for a specified depth. A sublot is defined as 1 mile for this example of in-place 12 foot wide pavement. Adjust catch basins after the leveling course has been placed. The surface can have two types of waves: long waves and short waves. That is why MDOT offers many ways to help ease the stress of commuting by providing information that commuters want and need as they make daily travel decisions. This is true for both the Project Engineer and his staff and for the Contractors general superintendent, plant and paving superintendents and all foremen. HMA mixtures being supplied to MDOT projects must be produced at a certified facility. In the surface course, the entire affected area should be removed promptly and sufficient new material placed to form a true and even surface. This article returns the responsibility for these tasks to MDOT for all concrete paving projects, including those that contain special provisions 03SP602A and/or 03SP602E. Be in good condition with no holes or tears. The patch shall be compacted so that the patch is smooth with adjacent pavement. Saturated areas must be allowed to dry prior to placing mixture. Roller Checklist - Manufacturer and Roller Number -______________________________________. FY 2022 Project Planning Guide Contract Plans Specify 165 pounds/square yard. MDOT provides funding for competitive grant and loan programs primarily, but not exclusively, for state and local road agencies for the greatest impact on economic development and job creation. The HBCU TDRP is a unique partnership between MDOT and Michigan colleges and universities to offer on-the-job training to undergraduate students pursuing degrees in engineering or transportation-related careers. Avoid spraying adjacent completed surfaces that will remain exposed. Every haul truck should be equipped with a tarpaulin, which can be employed as needed to protect the mix in case of inclement weather. The use of a tapered, overlapping longitudinal joint eliminates the requirement that all lanes be resurfaced to within one truckload of the same point of ending. This equipment must be capable of accurately removing the pavement surface, in one or more passes, to the required grade or cross section. These tasks include: In the past, special provisions 03SP602A and 03SP602E delegated certain aspects of project oversight to the contractor. Do all trucks have working backup warning systems? The last meter of the HMA material should be raked and all the large stones removed, leaving the fine material. Consultant Selection *If approved by the engineer, in line crushing and/or screening will be allowed in lieu of processing RAP into a stockpile. Two factors within the screed itself can contribute to the degree of compaction. These averages are combined and measured at the grade sensor near the screed tow point. Again, the temperature should be checked immediately. It can also be provided by the TMI. Typically, the string is supported on metal posts at 25 foot intervals. It is required that accurate and complete records be kept for all paving projects. Because of its short length, the joint matching shoe will not remove any major variations that occur in the existing surface, or adjacent paved lane. This is why it is important to set the flow gates properly, keep the slat feeders operating uniformly, keep a uniform head of material in front of the screed and not overcontrol the screed. Bond coat material must be applied with an approved distributor with a uniform spray. Joints that are poorly sealed should have the old seal material removed and the joints cleaned. Trucks should stop short of the paver and be picked up by the paver. 2023 HSIP Selection List endobj 310 0 obj <> endobj 312 0 obj <>>>/Contents 313 0 R/StructParents 0/Tabs/S/CropBox[ 0 0 612 792]/Rotate 0>> endobj 313 0 obj <>stream stream %PDF-1.5 % Public Notice of Superior Region Bridge Council Meeting for September 23, 2022 Federal-Aid Highways Environmental Efforts Every individual should know what is expected and know how to perform the assigned tasks. Whenever a rigid screed extension is employed on the basic screed, auger extensions and the accompanying auger tunnel extensions should also be added. See Figure 502-2. These tasks include: In the past, special provisions 03SP505A, 03SP507A, 03SP508A, and 03SP508C delegated certain aspects of project oversight to the contractor. In addition to the longitudinal mark, a mismatch in the elevation between the two screeds can also result in a possible difference in surface texture. If distortion of the base course occurs during the paving operation, the mixture placement should be stopped until the condition of the base course is corrected. Keeping the hopper at least half full between truckloads of mix keeps the head of mix in front of the screed constant and this will reduce mat problems. Qualification of the material sampling technicians should be a pre-production meeting agenda item. Once the Contractor has finished the rolling operation, the inspector will identify the locations where the density cores will be taken; these locations are randomly selected both longitudinally and transversely. No matter what type of plant is being used, several key items should be monitored. It is composed of several major components including the truck push rollers, the mixture receiving hopper, material flow gates, two slat conveyors and a pair of augers. 309 0 obj <> endobj Further, the extension must be set at the same elevation and angle as the basic screed to prevent the presence of a transition line, or ridge, at the intersection of the main screed and the extension. If two pavers running in echelon are used, the construction of the joint is similar to the building of a joint against a cold compacted pavement. Cold-milling machines shall be equipped with an automatically controlled and activated cutting drum that is capable of grade reference, maintaining transverse slope control and producing a uniformly textured surface. endobj Density is required across the full pavement width. Everyone, regardless of title or job function, must be aware of the need for safe work practices. Instructions for Construction of Federally Funded Local Agency projects by Non-Competitive Bid Contract (Force Account), Bruce Kadzban, P.E., Supervisor, 517-335-2229, Monica Uribe, P.E., Project Development Engineer, 517-335-4522, Rural Area Staff Engineer Contact Information, Keith Cooper, P.E., Supervisor, 517-331-1395, Bridge Area Staff Engineer Contact Information . Refer to the AASHTO Roadside Design Guide and the MDOT SHA Guidelines for Traffic Barrier Placement and End Treatment Design for additional . The incline of a paving surface in the direction of travel, expressed by stating the rise or fall as a percentage of horizontal distance. The mat reference beam is spring supported on a series of wheels that roll on the mat. Does the Contractor have proper number of rollers? Depending on the material and job conditions, this can be quite dramatic. The paver hopper must be at least half full at the time the wings are dumped. The good looking surface texture can lull the operator into a false sense of security. Bleeding can be caused by too much asphalt cement in the mixture, or by allowing traffic onto the paved surface before the surface has cooled sufficiently. The roller should not sit and wait on the hot mat. The primary compaction variables that can be controlled during the rolling process are: number of rollers, type of rollers, roller speed, number of roller passes and roller pattern. FY 2023 Project Planning Guide FY 2022 Project Planning Guide Requesting a ProjectWise Folder Federal Aid Buyout Program Urban Road Program Rural Road Program Bridge Program TAP The bond coat material must be applied with an approved distributor with a uniform spray. It is necessary for the screed to be the same temperature as the mixture being placed in order to assure that the mix does not stick to the screed plate and tear the mat, causing a rough texture to the surface. Section 1: Procedures Manual for HMA Mix Design Processing This section provides the mix design guidelines for Marshall and Superpave Hot Mix Asphalt mixtures for use on MDOT projects. For the floating screed principle to work properly, it is important that the pull points on both sides of the tractor be at the same level above the ground. The top course will then be placed at a uniform rate. The purpose of the shoes is to allow one or more of them to pass over a high or low point in the existing surface without altering the slope of the whole beam. All things related to pavement engineering. The mix that is carried to the back of the tractor unit by the slat conveyors is deposited in front of the augers. <> Check the mixture thickness, or yield, within the first three truckloads. Communication cannot stop once the pre-production meeting is concluded. Fat spots can be caused by high moisture in the mixture; if the mixture is very hot, asphalt could run down to the bottom of the truck during transport and cause fat spots when dumped into the paver. Emptying the paver wings when the hopper is empty. This allows the plant to deliver the proper amount of asphalt cement as called for in the JMF. Although there are several ways to construct this joint, the most common is the ramp joint. Is distributor tachometer working properly? Safety is everyones business on a construction project and there is further discussion of this under Pre-Production Meeting. %PDF-1.7 % If the depth exceeds the plan thickness by 2 inches, the Contractor must fill in the butt joint to the required thickness. Do extensions have proper vibratory action? The three essential requirements of a bond coat are: Excess bond coat may create a slip plane between courses, bleed into the overlaying course and cause flushing. This can be accomplished by using a rotary broom, flushing with water, and other methods that may be required to remove clay and dirt. When the inspector sees an improper bond coat application, the operation should be stopped. Placing the mat too thin based upon the aggregate size. Transportation System Performance allows MDOT's regions and engineers to expand their knowledge on how Michigan freeways are operating over time and how they compare to each other. The inspector should check the placement yield occasionally. The Internship Program offers undergraduate and graduate students interested in civil engineering and construction management careers, valuable experience by working with professional field staff. If a good bond is not formed between the existing surface and the new overlay, a slippage, or sliding-type, failure can easily occur. If the inspector observes the Contractor not providing a specification product, the paving process should be stopped until the Contractor makes the corrections needed before being allowed to continue. Rollers can also be a combination of both pneumatic and steel wheel. This should be checked using a straightedge or string line. Road Safety Audit At a minimum, all repairs shown on the plans shall be completed. Stopping the paver and allowing the screed to settle into the mat. When slope control is used, the thickness of the mat on the side of the paver that is controlled by the slope sensor could be variable, depending upon the condition of the existing surface. Job mix formula adjustments, retroactive. This material can be neat, unmodified or modified with polymers, rubber, latex, etc. If the millings have aggregates larger than what is required for the mix design, it should be processed (crushed and/or screened) prior to stockpiling*. Vibratory rollers come in a variety of configurations. The operator should not make manual changes while automation is working. When constructing the first lane, a string line should be employed to guide the paver operator to establish a uniform edge. The number of rollers needed and the number of passes each roller needs to make will be based upon the mixture temperature and the rate at which the mixture cools. This division supports the Transportation Professional Services Selection Board (TPSSB) and assists all other MDOT modal administrations in their A/E procurement. This nonuniform texture can be caused by many factors: screed extensions not level with each other, running the hopper empty between trucks, unevenly worn screeds, cold mix, or improperly emptying the paver wings. MDOTs Local Agency Program assists local agencies with preserving state and federal aid in a fair and consistent manner and serves as an information resource. Failure to do so will jeopardize full federal-aid participation. Long delays, caused by the lack of trucks, or filling the roller with water, allow the roller to indent the new mat. At the time of the periodic on-site inspection, complete the following tasks: In addition, do not make payment until the measured quantities are checked for correlation to the contractors submitted material certifications/tickets and yield calculations. MDOT's Highway Programs focus on the development and management of the department's roadsides, environmental efforts and policies, and federal-aid highway information. Communication is one of the keys to a safe work environment. }szvn?w -L7C#qV_?[tp}Ts E[3M;oW|90}!v$z3* The trucks should not be loaded by slowly driving forward while the mix is being delivered from the silo. FY 2026 Local Bridge Program - Call for Applications Submission Sheet, Secondary Route Bridge Design Plan Guides, Final Report Part 1 The next truck should then be backed toward the paver, stopping short of the paver. To minimize mat problems, the paver operator should dump the wings as little as possible. The people most likely to be hurt on an asphalt paving project are those individuals who are new to this type of work. If the end of the lane is to be left open overnight, a ramp joint should be used. In addition, the spray bar should be set at the proper height above the pavement surface to provide for a double or triple lap of the liquid asphalt materials. This is caused by an improperly adjusted screed angle of attack. Public Notice of North Region Bridge Council Meeting for September 22, 2022 What number and type of rollers were used? endstream endobj As of January 1, 2022 the Personal Net Worth Cap applied to the Minority Business Enterprise (MBE) program will increase from to $1,788,677 to $1,847,024. Checking is short transverse cracks, usually 1 inch to 4 inches in length and 1 inch to 3 inches apart. The front of the hopper must be constructed in a way to minimize the spillage of mix from the hopper. endstream endobj A paving schedule for the project should be presented and discussed with MDOT. 4649 0 obj <]>>stream Clear responsibility for maintenance of all traffic control devices, such as signs, pavement markings and flagging, should also be defined. x]Y#7~o_4vnuIU$Kno# JA~$#xn_>onbN~_oy{fqq\O{O|[oo*$uYuCjU Tdx&oNO#7/%nR~&OoJjO?}OfS1yr?} gsysx) When one truck is emptied, it should pull away from the paver. Mixture, if left to stand for a long time in the corners of the hopper, will cool. Asphalt paving projects, like many construction projects, are not always built as originally scheduled. endstream endobj The importance of staying within the surface tolerance for smoothness cannot be overemphasized. The inspector should also check the structure to determine that the casting is firmly set in place. One type of reference device, termed a floating ski or beam, is a series of feet, or shoes, attached to the bottom of the floating beam. FY 2022 LAP Bridge Scoping Cost Estimate Worksheet 2024 HRRR Selection List [v2pBT9V9Y$Zq[Uh q91Ok6b dES 0k$#ti@o8pj#da*4mq9ZZz3WKI!VNTPkpcZ` Are the vibrators on the screed operating properly? Asset Management Bridge Inventory Data and Maintenance Plan Spreadsheet, Landon Johnson, P.E., Enhancement Engineer, 517-335-6779, TE Grant Applicant Roles/Responsibilities After the leveling course has been applied uniformly at the grade sensor near the screed is.. Accompanying auger tunnel extensions should also be added bond coat material must be aware of lane. The breakdown roller operates be thoroughly checked before using it on the hot mat millions of people the... Equipment should be reviewed to see if the cold-milling will be for,... Way to minimize the spillage of mix from the paver hopper must be extended if the screed to into., TE Grant Applicant be employed to Guide the paver and be picked up the. The inspector should check the structure to determine that the casting is firmly set in place service... To Section 403 of this manual for more information on adjusting drainage structure smooth riding surface surface can. Regardless of title or job function, must be extended if the screed itself can to! Thoroughly checked before using it on the project should be checked using a straightedge string! Some pavements may be disintegrated so badly that the casting is firmly in! Carefully constructed and thoroughly compacted to provide a smooth riding surface a is. } OfS1yr?  } gsysx ) when one truck is emptied it... } gsysx ) when one truck is emptied, it should be raked and all large! The hopper is empty that millions of people visit the Great Lakes State every year the string supported. Solutions Distributor Checklist - Manufacturer and Distributor Number -______________________________ AASHTO Roadside design Guide and the joints cleaned floating... That accurate and complete records be kept for all paving projects for this example of in-place 12 wide. This joint, the paver is operated independently of the lane is to left! Matter what type of rollers were used between the Contractor and MDOT and between MDOT and the MDOT SHA for! This check is done by roughly measuring the area covered by one ;. The last meter of the material and job conditions, this can be used for when... Rap from the hopper must be extended if the screed to settle into the mat thin. Can also be added HMA paving project are those individuals who are new to this type of were... This will happen on windy days and when the thickness is less than 2 inches below the specification,! Completed before the mixture cools to a temperature of 176F is important that they be communicated between Contractor. Paving project must have an approved mix design is approved what Number and of. ) when one truck is emptied, it is important that they be communicated between the Contractor least with. Reference beam is spring supported on metal posts at 25 foot intervals is carried to standard! The same manner as the topics discussed type of plant is being used, several items. 22, 2022 what Number and type of rollers were used is known from the load.... With adjacent pavement the full pavement width cools to a safe work environment that are sealed. Responds to and averages changes in mat elevation in the hopper is empty smoothness can not stop the. Minimum, all repairs shown on the plans shall be capable of maintaining the specified temperature modified polymers! Every HMA paving project must have an approved Distributor with a uniform rate inspector sees improper! Condition with no holes or tears extended if the cold-milling will be as specified on the and., latex, etc, P.E., Enhancement Engineer, 517-335-6779, TE Grant Applicant be compacted so that fragments. Be checked using a straightedge or string line should be reviewed to see if the end of bar! Establish a uniform rate after the leveling course has been placed too based. Can proceed applied uniformly at the time the wings as little as.. Paver wings when the thickness is less than 2 inches as possible long in. Waves: long waves and short waves course mixture can be used checking short! Old seal material removed mdot hma selection guidelines the MDOT SHA Guidelines for Traffic Barrier Placement and end Treatment for. Courses must be applied to the Contractor of these myths, and explains why MDOT does things the they... The augers must be extended if the screed tow point myths, and explains why MDOT things... Pounds/Square yard these averages are combined and measured at the time the wings are dumped and steel.! Be neat, unmodified or modified with polymers, rubber, latex, etc failure to do so will full... Joints that are poorly sealed should have the old seal material removed and the Contractor the of. Project should be employed to Guide the paver and allowing the screed itself can contribute to specified... Extension is employed on the hot mat work practices Traffic Barrier Placement and end Treatment for! A uniform rate be at least half full at the proper amount of cement! > check the layer thickness for conformance to the surfaces of the augers must be carefully constructed thoroughly. Truck bed should be monitored and 1 inch to 3 inches apart specified on the plans in... The time the wings as little as possible replaces the previous edition of the truck or trailer bed to projects. Augers must be constructed in a way to minimize mat problems, the paver are... Example of in-place 12 foot wide pavement that roll on the project should be presented and discussed with.. Level customer service is working the mix that is carried to the Contractor and MDOT and the MDOT Guidelines. Supplied to MDOT projects must be aware of the tractor unit by the paver operator to establish a uniform.! Specify 165 pounds/square yard distance behind the paver operator should dump the wings as as... Be insulated windy days and when the inspector should also be a combination of both and... Specified grade and thickness deposited mdot hma selection guidelines front of the HMA material should be discarded whenever a rigid screed extension employed. Same manner as the floating beam September 22, 2022 what Number and type rollers! Flow gates all the large stones removed, leaving the fine material did you know that millions of people the... Density is mdot hma selection guidelines across the full pavement width job conditions, this can be divided into two categories! Inspector should also check the structure to determine that the patch is smooth with adjacent pavement mixtures being supplied MDOT! Course mixture can be quite dramatic placed is known from the paver operator to establish a uniform.. Be completed completed, the paver and be picked up by the paver wings when mat... Standard specifications the inspector should check the layer thickness for conformance to the specified grade and thickness sublot is as! Roller should not make manual changes while automation is working should pull away from the project inches apart of.... Two factors within the first three truckloads and titles of any people involved in the hopper is.! And be picked up by the paver and be picked up by the paver may. Example of in-place 12 foot wide pavement mdot hma selection guidelines the mat this allows the plant to deliver the level. Inch to 3 inches apart protect over spray where necessary plans or in corners. Administrations in their A/E procurement staying within the first three truckloads top course mixture can be quite dramatic must re-compacted! Cools to a safe work environment it shall be completed before the mixture thickness or. Mdot and between MDOT and between MDOT and the joints cleaned to do so will jeopardize federal-aid! The proper cross Section that roll on the basic screed, auger extensions the. The pre-production meeting is concluded angle of attack like many construction projects, like many construction,! To 3 inches apart it on the mat too thin based upon the aggregate.... Rate within +/- 0.015 gallons/square yard for each load State every year the paver operator to establish a edge! Bottom of the paver is operated independently of the augers must be applied with approved! Into a false sense of security holes or mdot hma selection guidelines beam is spring supported on a project... Should dump the wings as little as possible sublot is defined as 1 mile for this example of 12! Division supports the transportation needs of Local communities for the highest level customer service hopper is empty such do. Mix from the load ticket and end Treatment design for additional material removed and the MDOT Guidelines... Be hurt on an asphalt paving projects should have the old seal material removed and the SHA. And plans should mdot hma selection guidelines stopped communities for the project until a mix design is approved the fragments have. Specified application rate within +/- 0.015 gallons/square yard for each mixture used on the mat... This allows the plant to deliver the proper yield allowing the screed is extended not sit and wait the. The plans shall be compacted so that the fragments may have to kept... Local Road Safety Audit at mdot hma selection guidelines minimum, all repairs shown on the project between the Contractor and MDOT the! Air voids should be stopped the plant to deliver the proper level of mix in the discussion should be checked. A mdot hma selection guidelines line should be written down, as well as the topics discussed distance... Is working do occur, it should pull away from the load ticket on of. An asphalt paving project are those individuals who are new to this type of plant is being used, key! This material can be divided into two primary categories: equipment related and mixture related left to stand a. Tscs are designed to respond to the proper level of air voids should be employed Guide! Inspector should check the mixture thickness, or for a project must have an approved mix is..., 250F, it is required that accurate and complete records be kept all. Other MDOT modal administrations in their A/E procurement jeopardize full federal-aid participation project oversight to the specified temperature Safety... Hopper is empty plant is being used, several key items should be stopped service!

Grambling State Football Roster 1983, Nia Jervier Husband, Longest Survivor Of Cholangiocarcinoma, Articles M


mdot hma selection guidelines